Abstract
Umar krachi's poetry between imitation and originality: An assessment of radiological risk of a proposed site for a generic VVER 1000 MW nuclear power plant has been
conducted using international radiological assessment system (InterRAS) code and HotSpot Health Physics Code
in view of Ghana’s plan to add nuclear energy to her energy mix. The radiological risk assessment was estimated
by considering a hypothetical accident event for a generic VVER 1000 MW at the proposed site. The kind of
radionuclides to be release from the fuel meat to the gap between the meat and the clad defined the intervention
measures and countermeasures. The available radionuclide for the hottest fuel rod was determined by depleting
the core, a method sometimes termed as “source term estimation”. The direction of trajectory and Total Effective
Dose Equivalent (TEDE) received with the corresponding ground deposition of the released radionuclides were
estimated. The right protective actions were determined by estimating the appropriate intervention distances.
The maximum TEDE calculated were 3.7 × 10- 1 Sv at 0.1 km and 3.7 ×10- 1 Sv at 0.18 km for InterRAS and
HotSpot codes respectively towards the north-east of the release point. Radiological doses of 10 mSv and above
was limited to 1.0 km from the point of release. The intervention level for evacuation (50 mSv) ends at 0.5 km for
InterRAS code and 0.7 km for HotSpot code. The intervention level for sheltering (10 mSv) also ended at 1.5 km
for both InterRAS and HotSpot code. The highest total radionuclide ground deposition was estimated to be
approximately 4.0 ×106 kBq m-2 at 0.1 km and 3.8×106 kBq m- 2 at 0.18 km for InterRAS and HotSpot
respectively. Beyond 5.0 km distance, the ground deposition was in the range of 0.1–1 kBq m- 2. Generally, the
estimated annual effective dose for the public was less than the 1 mSv limit, which is the annual allowable limit
for the public. Therefore, with respect to the outcome of the estimated results, there wouldn’t be any radiological
risk above the allowable limit, hence the site can be considered as the candidate site for the construction of the
proposed nuclear power plant.a close study of two poetic works
Description
Research Article