The District Chief Executive and Accountability in Ghana's District Assemblies, The Case of the Ledzokuku-Krowor Municipal Assembly (Lekma), 2000-2012

dc.contributor.advisorDebrah, E.
dc.contributor.advisorAsare, E.B.
dc.contributor.authorAkorli, C.K.
dc.date.accessioned2014-07-25T13:44:39Z
dc.date.accessioned2017-10-14T01:47:09Z
dc.date.available2014-07-25T13:44:39Z
dc.date.available2017-10-14T01:47:09Z
dc.date.issued2013-06
dc.descriptionThesis (MPhil)-University of Ghana, 2013
dc.description.abstractFor about three decades, Ghana has pursued decentralisation which has led to the transfer of power and resources to the local level with the aim of accelerating local development and democracy. Successful decentralization, however, depends on accountability of the District Chief Executive (DCE) who is the central figure of the District Assembly. This study which examined the nature of accountability in the Ledzokuku-Krowor Municipal Assembly (LEKMA) found that, there are several measures that have been put in place to hold the DCE accountable. First, the nomination of the DCE was approved by the District Assembly (DA). Second, all proposals of the DCE were subjected to the approval of the District Assembly. Third, the District Assembly could remove the DCE through a vote of no confidence. It was possible for the DA to investigate suspected acts of malfeasance by the DCE. Despite these, the study found weaknesses in the accountability measures. The DCE exerts control over the thirty percent members who are appointed by the President. Also, the DCE is manipulated by the ruling party and the President who appointed him to the position. As result, the DCE feels more committed and accountable to the President than to the DA. The study concludes that the appointment of the DCE by the President does not promote accountability in Ghana‟s District Assemblies.en_US
dc.format.extentxii, 143p.
dc.identifier.urihttp://197.255.68.203/handle/123456789/5208
dc.language.isoenen_US
dc.publisherUniversity of Ghanaen_US
dc.rights.holderUniversity of Ghana
dc.titleThe District Chief Executive and Accountability in Ghana's District Assemblies, The Case of the Ledzokuku-Krowor Municipal Assembly (Lekma), 2000-2012en_US
dc.typeThesisen_US

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Cosmos Kwame Akorli_District Chief Executive and Accountability in Ghana's District Assemblies, The Case of the Ledzokuku-Krowor Municipal Assembly (Lekma), 2000-2012_2013.pdf
Size:
1.31 MB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 2 of 2
No Thumbnail Available
Name:
license.txt
Size:
1.82 KB
Format:
Item-specific license agreed upon to submission
Description:
No Thumbnail Available
Name:
license.txt
Size:
0 B
Format:
Item-specific license agreed upon to submission
Description: