Institutional arrangement for mitigating and adapting to climate change-related flood risk in Greater Accra Metropolitan Area (GAMA)

dc.contributor.authorOwusu, A.B.
dc.contributor.authorAdu-Boahen, K.
dc.contributor.authorDadson, I.Y.
dc.date.accessioned2024-02-16T11:17:47Z
dc.date.available2024-02-16T11:17:47Z
dc.date.issued2024
dc.descriptionResearch Articleen_US
dc.description.abstractEpisodic floods, attributable primarily to climate change, global warming, and sea level rise, have worsened and continue to be a significant threat to life. Building resilience and improving the adaptive capacities of com munities under threat will require institutional and cross-agency collaboration. This paper assessed institutional arrangements for mitigating and adapting to climate change-related flood risk in GAMA, Ghana. Using a descriptive cross-sectional survey, the study collected and analysed data from 65 private businesses and governmental, community, and civil society organisations to assess how institutions collaborate in preparing and adapting to flood risks in the study area. The study finds that frequent flooding, destruction of property and lives, and regular community agitations have triggered high-level consciousness, institutional arrangements, and collaboration within and among communities to build capacity and resilience. In addition, organisations have been educating indigenes on flood preparedness, providing relief items to support flood victims, and conducting training and research. Organisations have also supported communities in developing sandbags, planning sea defence mechanisms, providing rescue and evacuation assistance, providing transportation and logistics, and relocating stranded flood victims. Despite these efforts, the lack of adequate funding and logistics, coupled with the absence of proper consultation and involvement of most organisations in making national-level decisions on climate change and flood-related issues, have rendered flood management efforts less effective. This paper makes the case that proactive and collaborative flood responses should replace reactive and individual approaches to improve flood control efficacy and minimise casualties and property losses.en_US
dc.identifier.otherhttps://doi.org/10.1016/j.cacint.2023.100129
dc.identifier.urihttp://ugspace.ug.edu.gh:8080/handle/123456789/41293
dc.language.isoenen_US
dc.publisherCity and Environment Interactionsen_US
dc.subjectInstitutional arrangementen_US
dc.subjectMitigationen_US
dc.subjectAdaptationen_US
dc.titleInstitutional arrangement for mitigating and adapting to climate change-related flood risk in Greater Accra Metropolitan Area (GAMA)en_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Institutional arrangement for mitigating and adapting to climate.pdf
Size:
4.48 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: